-total 45,000mt iron ore in fines 10 pct moloo
-puerto ordaz,Venezeula/n China
-first loading about 35,000mt at puerto ordaz berth no.2,and then move to berth no.1 loading abt 10,000mt
-laycan 8-17/Mar,2013
-l/d rate 8,000mt / 10,000mt shinc
-frt usd /mt fio bss1/1(invite owrs idea)
-comm 2.50 pct + 1.25 pct to ASA
-orinoco river toll to be for owrs a/c.
-need cranes,draft at loading port 10.3m
-berth no.2 draft 26 feet,berth no.1 draft 34feet
-total 45,000mt iron ore in lump 10 pct moloo
-puerto ordaz,Venezeula/n China
-first loading about 35,000mt at puerto ordaz berth no.2,and then move to berth no.1 loading abt 10,000mt
-laycan 21-30/Mar,2013
-l/d rate 8,000mt / 10,000mt shinc
-frt usd /mt fio bss1/1(invite owrs idea)
-comm 2.50 pct
+ 1.25 pct to ASA
-orinoco river toll to be for owrs a/c.
-need cranes,draft at loading port 10.3m
-berth no.2 draft 26 feet,berth no.1 draft 34feet
-total 35,000mt DRI C in bulk 10 pct moloo
-pulua,Venezeula/n China
-laycan early of April ,2013
-l/d rate 8,000mt / 10,000mt shinc
-frt usd /mt fio bss1/1(invite owrs idea)
-comm 2.50 pct
+ 1.25 pct to ASA
-orinoco river toll to be for owrs a/c.
-need cranes,draft at loading port 10.3m